Enlarge
Power line connection and road repair works were carried out on 3 April 2024.
With this work carried out by our electrical team, our zone's power distribution and lighting infrastructure has been strengthened.
Enlarge
Power line connection and road repair works were carried out on 3 April 2024.
With this work carried out by our electrical team, our zone's power distribution and lighting infrastructure has been strengthened.
Our Regional Directorate is here to answer all your questions about plots, infrastructure and permits.