Natural Gas Distribution

With our Natural Gas Unit working 24/7, we operate and maintain the network across the zone and handle subscription procedures.

Service

Natural Gas Distribution

7,332 m PE pipeline
131 Service boxes
38 Subscribers
7/24 Uninterrupted service

Our Natural Gas Unit was established in 2015 after the completion of the infrastructure works in our zone and operates 24/7.

Duties of the Natural Gas Unit

  • Maintenance and inspection of all natural gas lines in the zone
  • Preliminary review of internal installation projects
  • Gas invoicing
  • Consumption monitoring via the remote reading system
  • Periodic inspections carried out twice a year
  • Natural gas subscription procedures
  • Evaluating and resolving requests, reports and complaints

Network information

The network was built in 2015; 5,120 m of PE pipeline was laid in the 3rd zone and a total of 2,212 m in the 1st and 2nd zones. The lines were inspected and commissioned by İZMİRGAZ, the distribution company of the region.

  • The 1st and 2nd zones are supplied from the same station, the 3rd zone from a separate station
  • RM-B station capacities: 800 m³/h for the 1st and 2nd zones, 500 m³/h for the 3rd zone
  • The 12-19 bar pressure coming from the transmission line is reduced to 4 bar at the stations and delivered to companies through PE pipes
  • There is a ground-type service box in front of each plot (131 in total); there are 6 RM-C stations in the zone
  • The consumption of the 38 subscribers using natural gas is monitored by the remote reading system

Subscription steps

  1. 1
    Submitting the request letter

    The natural gas request letter is completed and submitted to the Regional Directorate.

  2. 2
    Energy permit documents

    The documents required for the energy permit are completed.

  3. 3
    Internal installation project

    A project complying with the installation specification is prepared by one of the companies authorized by BEGOS.

  4. 4
    Preliminary project review

    The internal installation project is reviewed by our Natural Gas Unit.

  5. 5
    Contract and undertaking

    The natural gas sales contract and the gas off-take undertaking are signed.

  6. 6
    Gas opening

    Gas supply is provided once the inspections are completed.