Field and infrastructure
Our Work
Maintenance, repair and renewal work carried out in our zone by our infrastructure teams.
44All works
8Electricity and Lighting
7Natural Gas
11Water and Sewerage
10Roads and Transport
5Environment and Landscaping
2Security and Training
1Communication Infrastructure
November 20251 works
August 20251 works
April 20252 works
March 202520 works
Maintenance and repair of the tree drip irrigation systems in Zone 3
28 March 2025 · Environment and Landscaping
2 photos
Renewal of the foundations of damaged poles in Zone 3
24 March 2025 · Electricity and Lighting
4 photos
Cleaning of the main entrance-exit road in Zone 2
24 March 2025 · Roads and Transport
4 photos
Replacement of water meters
24 March 2025 · Water and Sewerage
5 photos
Grating and drain connection for rainwater accumulating on 2/20 Street, Zone 3
18 March 2025 · Water and Sewerage
6 photos
Repair of the underground high-voltage cable fault on Yahya Kemal Beyatlı Street
18 March 2025 · Electricity and Lighting
3 photos
Tree pruning and environmental cleaning in Zone 3
18 March 2025 · Environment and Landscaping
5 photos
Pruning of trees at the main entrance of Zone 2
18 March 2025 · Environment and Landscaping
3 photos
Replacement of street light lamps in the zone
18 March 2025 · Electricity and Lighting
12 photos
Meter replacement at the natural gas station
18 March 2025 · Natural Gas
Laying of the natural gas connection line for Ünüvar Tekstil
18 March 2025 · Natural Gas
2 photos
Decommissioning of the idle power transmission line in Zone 1
18 March 2025 · Electricity and Lighting
Reconstruction of the damaged road on Remzi Peköz Street
10 March 2025 · Roads and Transport
3 photos
Start of filling works on the unopened section of 2/20 Street
10 March 2025 · Roads and Transport
3 photos
Construction of a speed bump in front of BEGOS College on Remzi Peköz Street
10 March 2025 · Roads and Transport
5 photos
Weld repair of the main water pipe in Zone 3
10 March 2025 · Water and Sewerage
2 photos
Repair of the water leak in front of ADS Ayhan Dişli
10 March 2025 · Water and Sewerage
3 photos
Repair and reinstallation of the artesian well pump in Zone 1
10 March 2025 · Water and Sewerage
2 photos
Türk Telekom internet cable excavation
10 March 2025 · Communication Infrastructure
Repair of the main water pipe burst and drain in Zone 3
10 March 2025 · Water and Sewerage
August 20241 works
July 20241 works
April 202418 works
Gas turned on for participant companies connected to the natural gas network
3 April 2024 · Natural Gas
Road marking on Yahya Kemal Beyatlı Street
3 April 2024 · Roads and Transport
9 photos
Water connection for a participant company
3 April 2024 · Water and Sewerage
9 photos
Installation of natural gas remote reading panels
3 April 2024 · Natural Gas
4 photos
Replacement of broken natural gas service boxes
3 April 2024 · Natural Gas
19 photos
Straightening of damaged road kerbs on 2/20 Street
3 April 2024 · Roads and Transport
6 photos
Natural gas meter calibration and replacements
3 April 2024 · Natural Gas
7 photos
Repair of the damaged concrete road on 2/20 Street
3 April 2024 · Roads and Transport
30 photos
Repair of the collapsed road in Zone 2
3 April 2024 · Roads and Transport
Repair of the water tank pipe
3 April 2024 · Water and Sewerage
2 photos
Fire training for Regional Directorate staff
3 April 2024 · Security and Training
4 photos
Repair of the damaged road on Yahya Kemal Beyatlı Street
3 April 2024 · Roads and Transport
13 photos
Repair of lighting faults
3 April 2024 · Electricity and Lighting
4 photos
Security staff training and meeting
3 April 2024 · Security and Training
2 photos
Relocation of the power line in Zone 3
3 April 2024 · Electricity and Lighting
9 photos
Power line connection and road repair works
3 April 2024 · Electricity and Lighting
29 photos
Partial asphalting of roads in Zone 3
3 April 2024 · Roads and Transport
22 photos
Installation of LED lighting
3 April 2024 · Electricity and Lighting
5 photos
Road marking on Yahya Kemal Beyatlı Street
3 April 2024 · Roads and Transport
9 photos
Water connection for a participant company
3 April 2024 · Water and Sewerage
9 photos
Installation of natural gas remote reading panels
3 April 2024 · Natural Gas
4 photos
Replacement of broken natural gas service boxes
3 April 2024 · Natural Gas
19 photos
Straightening of damaged road kerbs on 2/20 Street
3 April 2024 · Roads and Transport
6 photos
Natural gas meter calibration and replacements
3 April 2024 · Natural Gas
7 photos
Repair of the damaged concrete road on 2/20 Street
3 April 2024 · Roads and Transport
30 photos
Repair of the collapsed road in Zone 2
3 April 2024 · Roads and Transport
Repair of the water tank pipe
3 April 2024 · Water and Sewerage
2 photos
Fire training for Regional Directorate staff
3 April 2024 · Security and Training
4 photos
Repair of the damaged road on Yahya Kemal Beyatlı Street
3 April 2024 · Roads and Transport
13 photos
Repair of lighting faults
3 April 2024 · Electricity and Lighting
4 photos
Security staff training and meeting
3 April 2024 · Security and Training
2 photos
Relocation of the power line in Zone 3
3 April 2024 · Electricity and Lighting
9 photos
Power line connection and road repair works
3 April 2024 · Electricity and Lighting
29 photos
Partial asphalting of roads in Zone 3
3 April 2024 · Roads and Transport
22 photos
Installation of LED lighting
3 April 2024 · Electricity and Lighting
5 photos