Enlarge
Meter replacement at the natural gas station was carried out on 18 March 2025.
This work, carried out by our Natural Gas Unit, contributes to the safe and uninterrupted operation of the natural gas network in our zone.
Enlarge
Meter replacement at the natural gas station was carried out on 18 March 2025.
This work, carried out by our Natural Gas Unit, contributes to the safe and uninterrupted operation of the natural gas network in our zone.
Our Regional Directorate is here to answer all your questions about plots, infrastructure and permits.