Electricity Distribution
Under the OIZ Electricity Distribution Licence dated 24.01.2008 and numbered ED-OSB/1471-5/1068 issued by the Energy Market Regulatory Authority (EMRA), our zone meets the electricity needs of all companies within its approved boundaries in accordance with Electricity Market Law No. 6446.
Energy source and network
- Source: TEİAŞ 154/10.5 kV Buca Transformer Substation, 10.5 kV TR-A busbar
- Feeders: H18 (F13) Buca-13 (EGS-1) and H19 (F14) Buca-14 (EGS-2)
- Conductor: 10.5 kV, 3 x (1x240/35) mm² MV underground cable
- Distribution system: ring and radial structure; all transformer substations are built for 10.5 kV
| Transformer type | Quantity | Total capacity |
|---|---|---|
| OIZ distribution transformer (building type) | 11 | 16,230 kVA |
| Private factory transformer (building type) | 25 | 22,250 kVA |
| Total | 36 | 38,480 kVA |
Our duties and responsibilities
- Planning investments in the distribution system and building new, improvement and general lighting installations
- Operating, maintaining and repairing the distribution system in an environmentally friendly manner and taking the necessary safety measures
- Providing connection and system usage services without discrimination between equal parties
- Carrying out meter reading, index, accrual and collection procedures; reporting demand forecasts to TEİAŞ
- Assisting eligible consumers who wish to change their supplier and forwarding records to EPİAŞ
- Evaluating and processing unlicensed electricity generation applications
- Coordinating with GDZ EDAŞ, Gediz Electricity Retail, TEDAŞ, TEİAŞ, EPİAŞ and EMRA
Our routine work
- Our electricity team is on constant duty; the main power line and main transformers are attended to immediately
- Routine inspections and annual periodic maintenance of OIZ transformers are carried out
- Street lighting failures are repaired; LEDs are used in renewed luminaires
- Existing cables are supervised during excavations within the zone
- Consumption and generation meters are read every month, and invoicing and netting are carried out
- Monthly total consumption is reported to OSBÜK, solar plant tables to TEDAŞ and unlicensed generation network data to EMRA
New energy demand and capacity increase
-
1
Receiving the request
The company submits its request for a new connection or a contracted capacity increase to the Regional Directorate.
-
2
Connection opinion
The network status is evaluated and a connection opinion is prepared.
-
3
Project review
The electrical project is reviewed for compliance with the legislation and network conditions.
-
4
Connection agreement
An agreement is signed in accordance with the Electricity Market Connection and System Usage Regulation.
-
5
Inspection and acceptance of the facility
The facility is inspected on site and acceptance procedures are completed.
-
6
Energizing
After the meter is installed, the facility is energized.